Steam-gas source of 880 MWe at the Počerady power plant – OB12 cooling tower
Construction of monolithic reinforced concrete structures of the lower construction of the new cooling tower with a height of128m
Customer Chladicí věže Praha a.s.
Place of realization Počerady power plant
Start date 2011
Completion date 2013